Moteur de recherche d’entreprises européennes
Financement de l’UE (9 999 999 €) : Bloc d’alimentation hybride à pile à combustible pour les applications ferroviaires Hor 17/12/2020 Programme de recherche et d'innovation de l'UE « Horizon »
Vue d’ensemble
Texte
Bloc d’alimentation hybride à pile à combustible pour les applications ferroviaires
The main objective of the FCH2RAIL project is to develop, build, test, demonstrate and homologate a scalable, modular and multi-purpose Fuel Cell Hybrid PowerPack (FCHPP) applicable for different rail applications (multiple unit, mainline and shunting locomotives) also suitable to for retrofit existing electric and diesel trains, to reach TRL7. The project will start with a multi-country, multi railway-use-case analysis in order to derive requirements for the design, implementation and test of the FCHPP. Based on that the FCHPP will be designed and demonstrated in a retrofitted Bi-mode multiple unit that draws electricity from the catenary while operating on electrified sections and uses the FCH system as power source on non-electrified sections supported by an innovative train wide energy management system to minimise the energy and power consumption. In order to improve the energy efficiency of FCH traction systems, innovative on-board solutions are identified and benchmarked. The train demonstrator tests will be carried out cross-border in Portugal and Spain and homologation will be seeked for three EU countries. A systematic screening of H2 and rail related EU-wide normative and standard frameworks concerning gaps related to an EU-wide implementation of FCH Bi-mode trains will be carried out. These activities, closely interconnected to the design, testing and homologation of the FCHPP demonstrator train activities, will result in the proposition of changes to and active involvement in standardization and norming workgroups. An important aim of the FCH2RAIL project is to demonstrate the competitiveness of FCH against diesel trains. Therefore, project related KPI are collected and implemented to a LCC model which is applied to different rail sectors deriving cost reduction potentials. Dissemination will comprise the demonstration of the FCHPP and the train demonstrator complemented by intensive communication and publication activities.
| Administrador de Infraestructuras Ferroviarias | 221 875 € |
| Caf Digital & Design Solutions SA | 0,00 € |
| Caf Power & Automation SL | 0,00 € |
| Caf Turnkey & Engineering SL | 0,00 € |
| Centro de Ensayos y Analisis Cetest SL | 0,00 € |
| Centro Nacional de Experimentacionde Tecnologias de Hidrogeno y Pilasde Combustible Consorcio | 1 145 375 € |
| Construcciones y Auxiliar de Ferrocarriles Investigacion y Desarrollo SL | 0,00 € |
| Construcciones y Auxiliar de Ferrocarriles SA | 5 520 453 € |
| Deutsches Zentrum FUR Luft - UND Raumfahrt e. V. | 1 092 094 € |
| Faiveley Transport Leipzig GmbH & Co. KG | 0,00 € |
| Infraestruturas de Portugal SA | 113 181 € |
| Renfe Ingenieria y Mantenimiento Sme | 0,00 € |
| Renfe Operadora | 825 678 € |
| Renfe Viajeros SA | 0,00 € |
| Stemmann-Technik GmbH | 297 412 € |
| Toyota Motor Europe N.V. | 783 931 € |
https://cordis.europa.eu/project/id/101006633
Cette annonce se réfère à une date antérieure et ne reflète pas nécessairement l’état actuel.