Moteur de recherche d’entreprises européennes

Financement britannique (100 889 £) : Détection des fractures pendant le forage et stimulation optimisée Ukri 01/04/2015 Recherche et innovation du Royaume-Uni, Royaume Uni

Vue d’ensemble

Texte

Détection des fractures pendant le forage et stimulation optimisée

Abstract This project proves whether shale gas fracture pathways can be identified by using the Smart Reamer. If proven, this will validate a lucrative Smart Frac system. Potentially, this project is a game changer as it maximises production by locating natural fractures (better fracturing job) and sets the ideal location for hydraulic fracture stimulation (wellbore isolation devices). It eliminates cycles of entry and exit into the wellbore with wireline. The concept is patent pending in the US, and a PCT for Brazil, China, Gulf Cooperation Countries. The project builds on the successful Smart Reamer TSB 720002 and harnesses the expertise of BG and Smart drilling in an exciting new technology for fracture detection. Oil companies will be provided with data that is currently missing between drilling and completing a well. TSB funding will support such validation and help allay certain socio-environmental concerns. Oil and Gas end users are backing the Smart Frac and will facilitate further development of the Smart Frac system. The project will allow the concept to maximise UK shale gas recovery while providing assurance on environmental monitoring downhole.
Category Feasibility Studies
Reference 131872
Status Closed
Funded period start 01/04/2015
Funded period end 31/03/2016
Funded value £100 889,00
Source https://gtr.ukri.org/projects?ref=131872

Participating Organisations

SMART REAMER DRILLING SYSTEMS LTD

£74 889,00

BG GROUP PLC

£26 000,00

Cette annonce se réfère à une date antérieure et ne reflète pas nécessairement l’état actuel. L’état actuel est présenté à la page suivante : Smart Reamer Drilling Systems Ltd., Slough, Royaume Uni.