Moteur de recherche d’entreprises européennes
Financement de l’UE (24,9 M €) : FLoAtinG offSHore oPtimisation en vue de la commercialisation Hor 07/08/2020 Programme de recherche et d'innovation de l'UE « Horizon »
Vue d’ensemble
Texte
FLoAtinG offSHore oPtimisation en vue de la commercialisation
The main aim of FLAGSHIP project is to validate and demonstrate a cost-effective 10MW Floating Offshore Wind Turbine (FOWT) to ensure imminent LCOE reduction in the range 40-60€/MWh in 2030 driven by economies of scale, competitive supply chains and a variety of innovations. The concept beyond is the first ever demonstration of a 10MW FOWT that will be demonstrated at a 1:1 scale in the Norwegian North Sea. It is a robust and innovative semi-submersible concrete floating platform that include easy-to-install anchoring design, novel moorings and mooring configuration, designs as well as new cable designs in with optimised installation and life management procedures. Consequently, this innovative demonstrator, as a pre-commercial windfarm located in the harsh conditions of the North Sea, will be the starting point for the large-scale assembly for 500 MW future commercial FOW farms, ensuring its feasibility to other specific locations in the Atlantic Ocean, Mediterranean and Baltic seas. In this context, the successful development will provide a fast maturing solution which could exploit untapped wind resources located in offshore locations not economically attractive today. For this purpose, the knowledge generated by FLAGSHIP and the results of the demonstrative scenarios, will be very important for the industrialisation of floating offshore wind farms. Technology demonstration can only be brought to the required commercial maturity level (TRL8) by the implementation in a real environment. To this end, 12 complementary partners with broad experience across the whole FOW value chain will join forces in a multi-disciplinary consortium. In addition, International stakeholders have already expressed their interest in the project, including Wind Europe, Ore Catapult, Carbon Trust & Sustainable Energy, making special emphasis in MHI Vestas Offshore Wind in order to support the demonstration project making available its largest capacity wind turbine up to 10MW.
| Aker Solutions AS | 15,6 M € |
| Concrete Structures AS | 0,00 € |
| Coremarine AS | 0,00 € |
| Coremarine Solutions SL | 341 600 € |
| Danmarks Tekniske Universitet | 844 500 € |
| DNV AS | 0,00 € |
| DR Techn Olav Olsen AS | 1 718 595 € |
| EDF Energy R&D UK Centre Ltd. | 0,00 € |
| Electricite de France | 470 487 € |
| Fundacion Cener | 600 000 € |
| Fundacion Instituto de Hidraulica Ambiental de Cantabria | 121 200 € |
| Germanischer Lloyd Industrial Services GmbH | 73 938 € |
| Iberdrola Renovables Energia SA | 1 477 000 € |
| Iberdrola Renovables Internacional SA | 0,00 € |
| Norwegian Offshore Wind AS | 568 750 € |
| Unitech Offshore AS | 2 677 021 € |
| Zabala Innovation Consulting SA | 417 375 € |
https://cordis.europa.eu/project/id/952979
Cette annonce se réfère à une date antérieure et ne reflète pas nécessairement l’état actuel.