Moteur de recherche d’entreprises européennes
Financement de l’UE (6 059 645 €) : Amélioration de l’efficacité énergétique et des ressources grâce à une meilleure coordination de la production dans les industries de transformation Hor 23/09/2016 Programme de recherche et d'innovation de l'UE « Horizon »
Vue d’ensemble
Texte
Amélioration de l’efficacité énergétique et des ressources grâce à une meilleure coordination de la production dans les industries de transformation
The goal of CoPro is to develop and to demonstrate methods and tools for process monitoring and optimal dynamic planning, scheduling and control of plants, industrial sites and clusters under dynamic market conditions. CoPro will provide decision support to operators and managers and develop closed-loop solutions to achieve an optimally energy and resource efficient production. In most plants of the process industries, the energy and resource efficiency of the production depends critically on discrete decisions on the use of equipment, shutdowns, product changeovers and cleaning or regeneration of equipment. CoPro will consider these discrete decisions in plant-wide dynamic optimization and develop integrated scheduling and control solutions. Advanced online data analytics will be developed for plant health and product quality monitoring. The detection of anomalies will trigger fast re-scheduling and re-optimization. CoPro will demonstrate advanced plant-wide and site-wide coordination and control in five typical use cases that cover a wide range of sectors of the process industries, and the whole value chain: - Petrochemical production site - Base chemicals and polymer production site - Recycling system in cellulose production - Consumer product formulation and packaging plant - Food processing plant In addition,CoPro will develop methods for the coordination of plants in industrial parks that belong to different companies, thus providing a basis for future industrial symbiosis. CoPro pays special attention to the role of operators and managers in plant-wide control solutions and to the deployment of advanced solutions in industrial sites with a heterogeneous IT environment. As the effort required for the development and maintenance of accurate plant models is the bottleneck for the development and long-term operation of advanced control and scheduling solutions, CoPro will develop methods for efficient modelling and for model quality monitoring and model adaption
| Agencia Estatal Consejo Superior de Investigaciones Cientificas | 152 129 € |
| Argent & Waugh Ltd. | 221 406 € |
| Asm Soft SL | 139 500 € |
| Covestro Deutschland AG | 437 900 € |
| Divis Intelligent Solutions GmbH | 299 250 € |
| Ecole Polytechnique Federale DE Lausanne | 0,00 € |
| Engage - KEY Technology Ventures AG | 0,00 € |
| Ethniko Kentro Erevnas Kai Technologikis Anaptyxis | 330 750 € |
| Frinsa del Noroeste SA | 204 383 € |
| Fundacion Universidad de Valladolid | 0,00 € |
| GAC | 6 250,00 € |
| Ineos Koln GmbH | 600 625 € |
| Ineos Manufacturing Deutschland GmbH | 0,00 € |
| Inno TSD | 349 875 € |
| Leikon GmbH | 416 063 € |
| Lenzing AG | 554 000 € |
| Orsoft GmbH | 150 594 € |
| Procter & Gamble Services Company N.V. | 615 431 € |
| Siemens Process Systems Engineering Ltd. | 385 490 € |
| Technische Universitat Dortmund | 896 625 € |
| Universidad de Valladolid | 299 375 € |
https://cordis.europa.eu/project/id/723575
Cette annonce se réfère à une date antérieure et ne reflète pas nécessairement l’état actuel.