Moteur de recherche d’entreprises européennes
Financement de l’UE (3 924 533 €) : Circuits intégrés photoniques hétérogènes III-V/Si à haute performance et à haut rendement utilisant une couche de liaison mince et uniforme Hor 01/01/2018 Programme de recherche et d'innovation de l'UE « Horizon »
Texte
Circuits intégrés photoniques hétérogènes III-V/Si à haute performance et à haut rendement utilisant une couche de liaison mince et uniforme
The objective of PICTURE project is to develop a photonic integration technology by bonding multi-III-V-dies of different epitaxial stacks to SOI wafers with a thinner and uniform dielectric bonding layer. This heterogeneous integration platform will enable higher performance lasers and photo-detectors using the optimized III-V dies. In addition, the thinner bonding layer will lead to record performance MOSCAP III-V/Si modulators, and to a new generation of wavelength tunable distributed feedback lasers. Moreover the full process including SOI process, bonding, III-V and back-end process will be made on a 200mm R&D CMOS line, leading to higher yield, smaller footprint and lower cost PICs. Two types of PICs with a total capacity of 400Gb/s will be developed, packaged and validated in system configuration. In parallel, PICTURE project will develop direct growth of high performance quantum-dot lasers and selective area growth on bonded templates for high density future generation of PICs. The project is coordinated by III-V Lab, and includes University of Southampton, CEA, University College London, Imec, Tyndall, Argotech and Nokia Bell Labs. The consortium is highly complementary, covering all skills required to achieve the project objectives: growth of semiconductor materials, silicon process and III-V process, design and characterization of PICs, prototyping and assessment of PICs in high bit rate digital communication systems: Apart from the adequacy of the consortium to achieve collectively the project objectives, the consortium partners have the potential to set up a comprehensive supply chain for the future exploitation of the project results, either by exploiting the results “in house” or by setting up suitable partnerships.
| Argotech AS | 297 255 € |
| Commissariat a L Energie Atomique et aux Energies Alternatives | 880 094 € |
| III-V LAB | 793 618 € |
| Interuniversitair Micro-Electronica Centrum | 379 688 € |
| Nokia Networks France | 292 780 € |
| University College Cork - National University of Ireland, Cork | 325 145 € |
| University College London | 369 288 € |
| University of Southampton | 586 666 € |
https://cordis.europa.eu/project/id/780930
Cette annonce se réfère à une date antérieure et ne reflète pas nécessairement l’état actuel.