Moteur de recherche d’entreprises européennes

Financement de l’UE (859 500 €) : Plate-forme européenne et chinoise pour le processus et l’équipement de forage d’aérostructures empilées Hor22/11/2016 Programme de recherche et d'innovation de l'UE « Horizon »

Texte

Plate-forme européenne et chinoise pour le processus et l’équipement de forage d’aérostructures empilées

Weight reduction and cost savings have driven composites research towards a number of recent high profile achievements. The increased use of anisotropic AL/CFRP/Ti stacks in aircraft structures has in turn created enormous challenges for the industry due to the difficulties that arise from drilling these heterogeneous stack materials. The project “European and Chinese Platform for Stacked Aero-Structure Drilling Process and Equipment (ECSASDPE)” focuses on the staff exchange between the partners of EU and China, and the development of key enabling techniques and equipment for theorbital drilling process of stacked AL/CFRP/Ti. It meets the objectives and requirements of the Marie Skłodowska-Curie Actions: Research and Innovation Staff Exchange (RISE), by establishing multiple bridges between European and Chinese institutions. The ultimate goal of ECSASDPE is to set up a long-term international and inter-sector collaboration consortium through research and innovation staff exchanges between 8 world-recognised institutions in the cutting-edge research area of high value manufacturing with promising applications in scientific and engineering sectors. The synergistic methodologies achieved by ECSASDPE will serve as the building blocks of the stacked composite materialmachining mechanism, equipment design, process monitor and control, and machining quality metrology and characterisation and scale up application, and thus enhance the leading position of the consortium for the scientific and technological progresses in high value manufacturing. This project is divided into six inter-related work packages: (1) Setup of knowledge base and road mapping; (2) Fundamentals of drilling process; (3) Key techniques for Equipment development; (4) System integration and performance verification; (5) Dissemination and exploitation, and (6) Project management. The work packages integrate all activities that will lead to the accomplishment of all the project objectives within 66 months.


Beijing Aeronautical Science AND Teechnology Research Institute OF Commercial Aircraft Corporation OF China Ltd. ?
Clermont Auvergne INP 22 500 €
The Queen's University of Belfast 252 000 €
UNIVERSITAET DUISBURG-ESSEN 90 000 €
Universite Clermont Auvergne 18 000,00 €
University of Portsmouth Higher Education Corporation 153 000 €
University of Warwick 324 000 €

https://cordis.europa.eu/project/id/734272

Cette annonce se réfère à une date antérieure et ne reflète pas nécessairement l’état actuel. L’état actuel est présenté à la page suivante : Beijing Aeronautical Science & Technology Research Institute, Commercial Aircraft Corporation of China, Beijing, Chine.