Moteur de recherche d’entreprises européennes
Financement de l’UE (12,7 M €) : Schémas d’interaction GRT-GRD intelligents, architectures de marché et solutions TIC pour l’intégration de services auxiliaires issus de la gestion de la demande et … Hor 01/01/2016 Programme de recherche et d'innovation de l'UE « Horizon »
Vue d’ensemble
Texte
Schémas d’interaction GRT-GRD intelligents, architectures de marché et solutions TIC pour l’intégration de services auxiliaires issus de la gestion de la demande et de la production distribuée
The project SmartNet aims at providing architectures for optimized interaction between TSOs and DSOs in managing the exchange of information for monitoring and for the acquisition of ancillary services (reserve and balancing, voltage regulation, congestion management) both at national level and in a cross-border context. Local needs for ancillary services in distribution systems are supposed to co-exist with system needs for balancing and congestion management. Resources located in distribution systems, like demand side management and distributed generation, are supposed to participate to the provision of ancillary services both locally and for the system in the context of competitive ancillary services markets. Through an in-depth and a simulation in a lab-environment, answers are sought for to the following questions: • which ancillary services could be provided from distribution to the whole system (via transmission), • which optimized modalities could be adopted for managing the network at the TSO-DSO interface and what monitoring and control signals could be exchanged to carry out a coordinated action, • how the architectures of the real time markets (in particular the balancing markets) could be consequently revised, • what information has to be exchanged and how (ICT) for the coordination on the distribution-transmission border, starting from monitoring aspects, to guarantee observability and control of distributed generation, flexible demand and storage systems, • which implications could the above issues have on the on-going market coupling process, that is going to be extended to real time markets in the next years, according to the draft Network Code on Electricity Balancing by ENTSO-E. Different TSO-DSO interaction modalities are compared with reference to three selected national cases (Italian, Danish, Spanish) also supposing the possibility of a cross-border exchange of balancing services. Physical pilots are developed for the same national cases.
| AIT Austrian Institute OF Technology GmbH | 534 354 € |
| Danmarks Tekniske Universitet | 1 129 125 € |
| Danske Commodities A/S | 68 932 € |
| Edistribucion Redes Digitales SL | 385 125 € |
| Edyna Srl | 404 249 € |
| Energinet | 109 234 € |
| Eurisco ApS | 253 206 € |
| European University Institute | 242 100 € |
| Fundacion Tecnalia Research & Innovation | 723 421 € |
| Katholieke Universiteit Leuven | 0,00 € |
| Novasol AS | 196 150 € |
| N-Side | 1 015 265 € |
| Nuestra Nueva Energia SL | 654 756 € |
| Nyfors Enterprise AS | 76 080 € |
| Ricerca SUL Sistema Energetico - RSE S.p.A. | 1 534 913 € |
| Selta S.p.A. | 777 766 € |
| Siemens S.p.A. | 549 344 € |
| Sintef AS | 20 281 € |
| Sintef Energi AS | 856 383 € |
| Stiftelsen Sintef | 138 298 € |
| Teknologian Tutkimuskeskus VTT Oy | 847 188 € |
| Terna Rete Italia S.p.A. | 329 921 € |
| University of Strathclyde | 381 799 € |
| Vlaamse Instelling Voor Technologisch Onderzoek N.V. | 1 100 696 € |
| Vodafone Procurement Company Sàrl | 329 344 € |
https://cordis.europa.eu/project/id/691405
Cette annonce se réfère à une date antérieure et ne reflète pas nécessairement l’état actuel.