Moteur de recherche d’entreprises européennes

Financement de l’UE (7 451 520 €) : DEsign et MOdelling pour améliorer la sécurité et l’efficacité de la base Hor 01/10/2017 Programme de recherche et d'innovation de l'UE « Horizon »

Vue d’ensemble

Texte

DEsign et MOdelling pour améliorer la sécurité et l’efficacité de la base

Electric mobility is a reality we can experience on our roads and cities. Electromobility is moving forward, driven by drastic cost reductions, higher performances and improved availability to support new business models of autonomous driving passenger cars and new vehicle fleets. DEMOBASE falls within this context with the main objectives to cut down development and testing efforts for e-drivetrains at least by a factor 2 and to improve their efficiency by 20%. Safety will be fully managed and new concepts developed for fleet applications. DEMOBASE is composed of 11 leading European partners with activities ranging from cells to vehicle to recycling. The main gain at vehicle level will come from global optimization taking into account interaction of the different specialties. Objectives at battery level will be achieved by massive digitalization, substituting the today sequential cell development then battery system development by a parallelization of these activities. This new process can be achieved only using enhanced cells models including safety features to define the cell conception for manufacturing and realizing in the same time frame battery management. Objectives at vehicle level will be achieved with a novel approach to design light-weight chassis. It will be demonstrated on a urban demo vehicle that will integrate the advanced battery pack and novels wheel-tire systems with low suspension mass and low rolling resistance. To secure project deliveries and reinforce collaborations which are an innovation key factor, DEMOBASE will be an original closed-loop project. In a first loop of the EV development, building blocks and their integration processes will be investigated and their efficiency assessed using Key Performance Indicators. Then the most efficient bricks and processes will demonstrate their added value in a second step in 6 months run starting from new high performances cells to operational EV. The DEMOBASE EV will be then evaluated on tracks.


Accurec-Recycling GmbH 516 875 €
Forschungszentrum Julich GmbH 650 250 €
Fraunhofer Gesellschaft ZUR Forderung DER Angewandten Forschung e. V. 697 459 €
IFP Energies Nouvelles 832 230 €
Infineon Technologies AG 1 023 049 €
Institut National de L Environnement Industriel et des Risques - Ineris 246 419 €
Interactive Fully Electrical Vehicles Srl 1 122 500 €
K & S GmbH Projektmanagement 194 625 €
Ma Srl 408 750 €
Modelon AB 488 250 €
Saft 1 271 114 €

https://cordis.europa.eu/project/id/769900

Cette annonce se réfère à une date antérieure et ne reflète pas nécessairement l’état actuel.