Financement de l’UE (10,6 M €) : EcoSwing - Optimisation des coûts énergétiques à l’aide d’éoliennes supraconductrices - Première démonstration au monde d’un générateur supraconducteur DD léger à … Hor 01/03/2015 Programme de recherche et d'innovation de l'UE « Horizon »

Vue d’ensemble

Texte

EcoSwing - Optimisation des coûts énergétiques à l’aide d’éoliennes supraconductrices - Première démonstration au monde d’un générateur supraconducteur DD léger à faible coût de 3,6 MW sur une éolienne

EcoSwing aims at world's first demonstration of a superconducting low-cost, lightweight drive train on a modern 3.6 MW wind turbine. EcoSwing is quantifiable: The generator weight is reduced by 40% compared to commercial permanent magnet direct-drive generators (PMDD). For the nacelle this means a very significant weight reduction of 25%. Assuming series production, cost reduction for the generator can be 40% compared to PMDD. Finally, reliance on rare earth metals is down by at least two orders of magnitude. This demonstration is enabled by the increasing maturity of industrial superconductivity. In an ambitious step beyond present activities, EcoSwing will advance the TRL from 4-5 to 6-7. We are shifting paradigms: Previously, HTS was considered for very big, highly efficient turbines for future markets only. By means of cost-optimization, EcoSwing targets a turbine of great relevance already to the present large-scale wind power market. The design principles of EcoSwing are applicable to markets with a wide range of turbine ratings from 2 MW to 10 MW and beyond. Despite technological successes in superconductivity, turbine manufacturers and generator suppliers are hesitant to apply HTS into the wind sector, because of real and perceived risks. The environment inside a wind turbine has unique requirements to generators (parasitic loads and moments, vibration, amount of independent hours of operation). Therefore, a demonstration is required. The consortium represents a full value chain from materials, over components, up to a turbine manufacturer as an end-user providing market pull. It features competent partners on the engineering, the cryogenic, and the power conversion side. Also ground-based testing before turbine deployment, pre-certification activities, and training are included. EcoSwing can become tangible: The EcoSwing demonstrator will commence operation in 2018 on an existing very modern 3.6 MW wind turbine in Thyborøn, Denmark.


Delta Energy Systems GmbH 1 088 850 €
ECO 5 GmbH 1 642 194 €
Envision Energy (Denmark) ApS 1 527 029 €
Fraunhofer Gesellschaft ZUR Forderung DER Angewandten Forschung e. V. 1 008 455 €
Germanischer Lloyd Industrial Services GmbH 52 238 €
Jeumont Electric SAS 999 708 €
Sumitomo (SHI) Cryogenics of Europe Ltd. 296 450 €
Theva Dunnschichttechnik GmbH 1 988 206 €
Universiteit Twente 1 988 605 €

https://cordis.europa.eu/project/id/656024

Cette annonce se réfère à une date antérieure et ne reflète pas nécessairement l’état actuel.